How to Maintain Vertical Machining Center in Winter

Case, News 2024-11-06

When using a vertical machining center, many problems are caused by some small reasons. Developing some good habits, careful maintenance, and careful inspection before operation can reduce problems and greatly extend the service life. A carefully maintained equipment and an unmaintained equipment may have a service life several times different. I hope that users will never ignore the value of maintenance.

Dabai Precision Machine Tool (Jiangsu) Co., Ltd. is a high-tech enterprise specializing in R&D, design, production and manufacturing of CNC machine tools and CNC machine tools. The company adheres to the production concept of high quality and high cost performance to create a high-end CNC machine tool brand.

Below Dabai introduces how to maintain the vertical machining center in winter.

  1. Ensure that the lubrication pump operates normally and preheat before operation.
  2. Ensure the fluidity of the coolant to prevent condensation due to low temperature. Due to the lack of coolant, the tool is not cooled in time.
  3. After get off work, if it is not possible to ensure that the coolant in the water tank does not condense, pour out the water and drain the coolant in the spindle and water pipe to prevent ice from causing blockage or rupture.
  4. If the coolant is poured out, do not forget to refill the water tank and run at a low speed to ensure that each outlet is normal.
  5. Clean up impurities in the cutting fluid in time to prevent blockage inside the spindle, resulting in blocked cold circulation, etc.
  6. Clean the chips in the machine tool in time to avoid drainage blockage or travel obstruction caused by accumulation, which may even cause machine tool failure.